Manchester Communication Academy (MCA)
525kW air source heat pump installation with 265kW solar PV system.
Devonshire Primary
Academy
ASHP installation connecting into the school’s existing underfloor heating network.
Gorseybrigg Primary School
Multi-technology renewable heating and generation project, integrating an ASHP, biomass boiler and solar PV array into a single coordinated system.
Hillside Specialist School and College
Biomass boiler system, including a purpose-built plant room building and automated pellet feed infrastructure
St Michael's School
Full ASHP installation, including heating emitter upgrades, and fabric improvements.
Shelbourne Motors
Biomass Pellet Boilers to turn its 29,500 sq.ft. showrooms and workshop space into a warm working environment.
A J Forester LTD
2.72 Megawatt installation of pellet boilers on 404,300 sq. ft expanse of poultry sheds and workshops
A series of recent installations